11
Project location: Sichuan
Customer name: Sinopec Corporation
Time: 2019-2024
Processing scale: Annual processing of 36000 cubic meters
Oil based mud reduction rate:>40%
Oil based cuttings: reduced water content of oil based cuttings<20%, reaching the condition of ton bag packaging, transported to the processing station for harmless treatment
Oil based resource utilization pathways : transported to the drilling team for recycling



Relevant Information