Case

2025-07

11

Reduction treatment of drilling oil-based mud

  • Project location: Sichuan

  • Customer name: Sinopec Corporation

  • Time: 2019-2024

  • Processing scale: Annual processing of 36000 cubic meters

  • Oil based mud reduction rate:>40%

  • Oil based cuttings: reduced water content of oil based cuttings<20%, reaching the condition of ton bag packaging, transported to the processing station for harmless treatment

  • Oil based resource utilization pathways : transported to the drilling team for recycling

1

2