On-site No-Landing harmless treatment for waste drilling mud

  • Project location: Tarim Oilfield, Xinjiang

  • Customer names: Sinopec, PetroChina, Zhongyuan Drilling Branch, Huabei Drilling Branch

  • Time: 2012-present

  • Processing scale: Annual processing of 35 wells, approximately 70000 cubic meters of mud

  • Solid phase resource utilization pathway: After treatment, the pH of the solid phase is 6-9, COD is less than 150mg/L, moisture content is less than 30%, and various heavy metals meet the relevant parameter requirements. It can be used for laying well sites, roads, brick making, and solidification materials

  • Liquid phase resource utilization pathway: After purification treatment, it can be reused, well site dust suppression, etc