On-site No-Landing harmless treatment for waste drilling mud

  • Project location: Zhongjiang, Chongqing

  • Customer name: Southwest Drilling Branch

  • Processing scale: Annual processing of 30 wells, approximately 46000 cubic meters of mud

  • Time: 2017-present

  • Solid phase resource utilization pathway: After treatment, the pH of the solid phase is 7-8, the moisture content is less than 30%, and various heavy metals meet the relevant parameter requirements. It is used as a raw material for well site hardening and brick making

  • Liquid phase resource utilization pathway: After purification treatment, it is reused for drilling fluid configuration to reduce freshwater consumption