Case

2025-07

11

Centralized harmless treatment of waste drilling mud and cuttings

  • Project location: Xinjiang

  • Customer name: PetroChina Company

  • Mud type: historical drilling waste mud, low water content, and abundant debris

  • Time: 2017-present

  • Capacity scale: Annual processing of 50000 cubic meters

  • Solid phase resource utilization pathway: After treatment, the pH of the solid phase is 6-9, COD is less than 150mg/L, moisture content is less than 30%, and various heavy metals meet the relevant parameter requirements. It can be used for laying well sites, roads, brick making, and solidification materials

  • Liquid phase resource utilization pathway: After purification treatment, it can be reused, well site dust suppression, etc